KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-26-2009
Number of Hours:  1.20
Manual Reference:  8-70
Brief Description:  Fwd Baggage Door #1

Started on the forward baggage door this morning.
-Fabricated the latching pins per the plans. Starts will drilling an 1/8" hole in the end of the tubing. Then cutting a 1/16" slot 1/2" into that same end. Then trimming to the overall length and then radius'ing that same end and beveling the opposite end.
-Then I deburred several of the components per the plans.

I will need to modify the door to account for my oversized speed-sloped windshield so more to come.
' style=

Cutting the slot into the end of one of the latch pins.

Cutting the slot into the end of one of the latch pins.

' style=

Latching pins done per the plans.

Latching pins done per the plans.

' style=

Deburred these parts of the baggage door.

Deburred these parts of the baggage door.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.