KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-6-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Rudder Pedals #6

Started to put together the ground adjustable rudder pedals and got to the part about the master cylinder installation and it referred to a drawing #34 that I didn't have. I contacted Van's and they email me a copy to show where the hole in the pedal should be drilled and the hardware callout. I drilled the holes and reamed to 3/16 for the AN3 bolts and assembled the rudder pedals on the bench -everything went together well. I needed to prime the cable links so that was done. I am expecting an order from Spruce with the aluminum to make the extensions on the bottom of the pedals and the reservoirs to avoid the remote reservoir that Vans uses.
' style=

Here's a shot of the missing drawing that i needed

Here's a shot of the missing drawing that i needed

' style=

Everything temporarily bolted together.

Everything temporarily bolted together.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.