-Deburred the baggage shelf -Deburred the rear bulkhead cover (access panel now) -Countersunk the hinge and access panel for flush NAS1097 flush rivets -Riveted the hinge to the access panel trying to double flush - rivets where allittle long but they are flush enough to allow full range of motion on the hinge, which was the point. -Drilled and dimpled the bagg shelf for 3 nutplates in the existing location -Installed the nutplates -Assembed everything and it works like a charm!!!
I still have a couple of items that need rivets, but the functional part is done.