KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  9-24-2008
Number of Hours:  1.00
Manual Reference:  8-35
Brief Description:  Fuselage riveting #9

Riveted the horizontal stabilizer mounting bars to the F811 bulkhead assembly per the plans. Had to drill out one rivet due to the Vans rivet specification being too short. I went up to the next size and it worked much better. Then I drilled the bottom two holes for the tailwheel mount 1/4" attach holes.
' style=

Riveting the Horizontal stab bars to the F811

Riveting the Horizontal stab bars to the F811

' style=

1/4

1/4" holes going into the F811 assembly.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.