KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  8-3-2008
Number of Hours:  1.90
Manual Reference:  8-27
Brief Description:  Drilling the fuselage #6

More drilling today.
-Finished final drilling the left and right aft side skins to the upper longerons.
-Match-drilled the left / right aft side skins to the lower and mid longerons.
' style=

Drilling the right upper longeron.

Drilling the right upper longeron.

' style=

Drilling the left upper longeron.

Drilling the left upper longeron.

' style=

Drilling the right lower longeron.

Drilling the right lower longeron.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.