KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  8-1-2008
Number of Hours:  2.20
Manual Reference:  8-26
Brief Description:  Drilling the fuselage #4

-Match drilled #30 fwd side skins to the upper longerons and the engine mount brackets (left/right).
-Match drilled #30 the engine mount upper angle to the upper longerons (left/right)
-Match drilled #40 upper longerns to the fwd side skins (left/right)
-Final drilled #19 the holes depicted in the plans in the bottom of the landing gear box assemblies (left/right).
-Match drilled #30 and #40 the remaining holes in the left and right fwd side skins.
' style=

Upper engine mount, firewall, longeron junction (left shown) match drilled #30

Upper engine mount, firewall, longeron junction (left shown) match drilled #30

' style=

Match drilling the upper longeron and fwd side skins to #40 (note 'the cup')

Match drilling the upper longeron and fwd side skins to #40 (note 'the cup')

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.