KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-2-2008
Number of Hours:  1.80
Manual Reference:  8-23
Brief Description:  Tailcone Bulkheads #4

I actually did a little bit yesterday (primed the F807 bulkhead) but it was so minor I just added the time to this entry for this morning.

-Riveted the F809, F808, & F807 Bulkheads togther - really easy with the pneumatic squeezer.

Then I started on the Aft Fuselage Assembly

-Trimmed the tooling indexes off of the Baggage Rib angles,
-Match drilled the baggage rib angle to the baggage ribs
-Match drilled the bellcrank rib to the baggage ribs
-Drilled out the nutplate holes to #40 for the rivets and #12 for the screws in the baggage rib angles
-Machine countersunk the #40 nutplate rivets in the baggage rib angles.
' style=

Riveting the F808 together with the squeezer.

Riveting the F808 together with the squeezer.

' style=

All of the bulkhead ribs are done except for the ones needing parts from VANs (bad part - F800).

All of the bulkhead ribs are done except for the ones needing parts from VANs (bad part - F800).

' style=

Preparing to match drill the baggage rib and baggage rib angles (L & R)

Preparing to match drill the baggage rib and baggage rib angles (L & R)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.