KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-24-2008
Number of Hours:  1.10
Manual Reference:  8-11
Brief Description:  Center Section #6

Short session today.

-Riveted the vertical bars onto the aft center section assembly. The rivets are short so go easy.

-Finished riveting the seat ramp supports using the offset rivet set in the gun - I hate that thing, hard to keep straight on the rivets. These came out good with no smileys.

-Put the AN5-11A bolts into the forward section per the plans. Torgued to 40 in/lbs and torque locked them.

-Put the seat ramp bolts in AN4-11A finger tight per the plans.
' style=

Backriveting the vertical bars (on the bottom side).

Backriveting the vertical bars (on the bottom side).

' style=

Put the 1/4

Put the 1/4" bolts in per the plans and torque locked them so I know they were torqued.

' style=

Forward and aft are ready to go toghether.

Forward and aft are ready to go toghether.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.