KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  4-21-2008
Number of Hours:  1.10
Manual Reference:  8-6
Brief Description:  Gear Tower - Assembly #11

I am in school this week (aircraft recurrent) so my progress will be a little spotty for the next 5 days.

Today I did:

-Cleco'd the aft and forward upper braces (F-802T-1 and F-802N-1) to the gear towers and match drilled.

-Cleco'd the throttle quadrant bracket (F-864D-1) and match-drilled.

-Drilled out the #40 nutplate rivet attach holes as specificed in the plans for the parts listed above.

-Machine countersunk the nutplate attach holes (all but one per the plans) in the F-878-L-1 & R-1 mid cabin braces.

-Dimple countersunk the nutplate rivet attach holes in the throttle quadrant bracket.

-Deburred all of the holes I drilled in the above steps. Edge deburred the same.

-Scuffed all of the parts for priming.
' style=

Match drilling the aft upper brace to the right gear tower.

Match drilling the aft upper brace to the right gear tower.

' style=

Drilling out the #40 nutplate attach holes in one of the mid cabin braces.

Drilling out the #40 nutplate attach holes in one of the mid cabin braces.

' style=

All of the parts discussed above ready for primer.

All of the parts discussed above ready for primer.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.