-Studied the plans and layed out the left wing tank attach bracket (F-863-1 L) These brackets (L/R) bolt to the fuselage at the base of the gear tower and connect to a similar looking tab on the fuel tank. Although the mounting holes will have to be drilled in place with the wings in position (means at the airport for me), I plan to do as much prefabrication as possible.