KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  9-9-2010
Number of Hours:  2.70
Manual Reference:  
Brief Description:  Gear tower fasteners #3

2.7 hrs to do 4 bolts. Seems impossible, but what was impossible was the access inside the gear tower where these little bolts reside. They crame so many fasteners in there that you can't start one without hitting another. Anyway the job is done and I'm one step closer to getting my top skin riveted on.
' style=

The outmost bolts (shown in sets of 3 on each side) got put in.

The outmost bolts (shown in sets of 3 on each side) got put in.

' style=

Hopefully this area will be under a skin soon.

Hopefully this area will be under a skin soon.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.