KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-28-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Misc Fuel tanks #2 plus leading edge prep work

Had a good 3 hr session this morning. I was able to get a few of the small items done on the fuel tanks. I am about to the point where I can't do much else until the ProSeal arrives.
-Drilled the 3/8 holes for the BNC connector on each tank (fuel quantity sending unit). I then mocked up and trimmed the capacitence plates (outboard ones) so they didn't interfere with the fuel tank stiffners. I then moved onto the fuel pickup for the right tank (I am using a conventional pickup on the right and a flop tube on the left). I fabricated the tube and put all the hardware together. I still need a flaring tool to flare the tube before I can install everything. From there I put away all the fuel tank parts and moved the left wing leading edge onto the bench and started removing the plastic on the rivet lines.
' style=

Fuel tank capacitence senders trimmed (outboard)

Fuel tank capacitence senders trimmed (outboard)

' style=

pickup tube on the right tank

pickup tube on the right tank

' style=

Removing the protective plastic from the rivet lines on the left wing leading edge

Removing the protective plastic from the rivet lines on the left wing leading edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.