KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  1-15-2007
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Wing spar counter-sinking continued #4

Continued to counter-sink the #8 screw holes for the fuel tank attach, this time on the right spar. Almost got through the bottom flane in an hour. Slow work due to moving the centering pilot which clecos and then clamps to the spar using the nut plate holes.
' style=

Both spar clamped to the bench for counter-sinking the #8 fuel tank screw holes

Both spar clamped to the bench for counter-sinking the #8 fuel tank screw holes

' style=

Another angle. The blue masking tape is to protect the seams in the spar from the aluminum chips

Another angle. The blue masking tape is to protect the seams in the spar from the aluminum chips

' style=

Doing the deed! Notice the cleco clamps they are hold a 1/8

Doing the deed! Notice the cleco clamps they are hold a 1/8" aluminum plate with a pilot hole under...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.