KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  11-25-2006
Number of Hours:  1.50
Manual Reference:  6-7
Brief Description:  Rolling Leading Edge

Rolled and riveted the leading edge per the plans. Not a fun job and much like trying to make a beer can with a pop riveter and a broom handle. The leading edge looks good, but not perfect. Once I had the holes lined up I drilled to 1/8" and installed the pop rivets per the plans.
' style=

broom handle taped to the leading edge with duct tape

broom handle taped to the leading edge with duct tape

' style=

Pop riveting the leading edge

Pop riveting the leading edge

' style=

Finished with the leading edge

Finished with the leading edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.