KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  12-21-2009
Number of Hours:  1.10
Manual Reference:  
Brief Description:  Fuselage wiring runs #3

Got several little things accomplished.
Finished pulling the battery cable conduit up through the rt gear tower.
Drilled the holes and installed grommets for the strobes wires (left and right)
Drilled hole for rear seat map light
' style=

Here's the batt cable conduit bunched up under the rt console prior to pulling it thru the gear tower

Here's the batt cable conduit bunched up under the rt console prior to pulling it thru the gear tower

' style=

Back seat maplight

Back seat maplight

' style=

One of the strobe wire grommets near the bottom longeron

One of the strobe wire grommets near the bottom longeron

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.