KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-4-2009
Number of Hours:  2.80
Manual Reference:  9-3
Brief Description:  Canopy #10 and Canopy Skirt #1

Put the canopy back on the airplane. Cleco'd it back on and then riveted it on temporarily with pop rivets spec'd by the plans. That is nerve racking pulling those blind rivets into the plexiglass. Went well though.

Then I layed out and drilled the canopy skirt holes into the canopy frame per plans.
' style=

Here it is riveted on, cleco's are obviously still in place.

Here it is riveted on, cleco's are obviously still in place.

' style=

Here's the template I made per the plans used plexiglass instead of aluminum which worked good.

Here's the template I made per the plans used plexiglass instead of aluminum which worked good.

' style=

All the holes are drilled.

All the holes are drilled.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.