-Riveted the crossbrace I fabricated to the F807 bulkhead to support the front of the new aft baggage shelf. -Installed all of the nutplates (6) that hold down the shelf.
Crossbrace installation (attached to the F807 bulkhead)
Crossbrace rivets installed.
Installed the 6 nutplates (3 on each side) for the new aft shelf.