-I jumped over and counter sunk the rear shoulder harness anchor so they can be primed.
No on to the rudder pedals. I reamed the #12 holes in the center of the rudder pedal assembly and installed the hardware. Then I assembed them onto the tracks that were provided. I then marked off the fuselage where they should go and layed them onto the fwd floor. I had to remove one rivet from the firewall area (I did the two gear tower rivets previously). Eveything looks good except I forgot to layout the holes in the tracks so I quickely removed the tracks from the assembly and layed out and drilled the holes and reassembed everything.
Edges of the left track goes 22/32 from the centerline of these rivet holes.
Here's the rudder pedal assembly roughly in place.
After laying out the rivet holes I used an automatic punch to centerpunch the holes for #40 pilot hole