Started on the floor boards this morning. -Trimmed the upper corners of the Footwell. -Deburred the left and rigth floorboards, the footwell, and the fwd floorboard. -Separated and edge deburred the F805F-1 spacers (2) -Cleco'd the right floorboard and spacers into place -Cleco'd the left floorboard into place -Cleco'd the aft baggage comparment floor and shelf into place -Final drilled #30 the aft baggage floor to left and right floorboards to F807 bulkhead holes -Final drilled #30 the remaining aft baggage floor and shelf holes
Right floorboad
Left and right floorboard in place.
Now with the aft baggage floor and shelf in place.