Very productive day. -Cleco'd and riveted the F811 bulkhead to the F828 bottom skin (using the same method as I used to rivet F812 to the F828). -Riveted the keeper rivets in the aft end fo the tailwheel spring mount. -Cleco'd the lower longerons and the F828 aft-most bottom tailcone skin to the fuselage. -Cleco'd the F857C angles to the fuselage -Cleco'd the F808, F809, F810 bulkheads to the fuselage. -Riveted the F818 baggage ribs to the F808 bulkhead. -Cleco'd the F842 aft bottom skin to the fuselage. Then me and Mitchel CAREFULLY sat it on sawhorses and flipped it upsidedown for riveting.
more photos on the next entry.
Riveting the F811 to the F828 aft bottom skin.
Lower longerons and F828 assembly going onto the fuselage.
Bulkheads are cleco'd in & I'm riveting the bagg ribs to the F808 bulkhead.