KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-19-2008
Number of Hours:  1.70
Manual Reference:  8-10
Brief Description:  Center Section #2

I actually combined 3 sessions into 1 on this entry. I did .3 last night fluting the forward and aft center section bulkheads (4). Then I did 1.1 hrs this morning working per the plans (see below) and then I did another .3 this evening priming the parts that I had been working on (fwd bulkheads x2, control mount, seat belt lug spacers, seat belt lugs, and countersinks on the center section itself).

-Fluting (as described above).

-Match drilling the forward bulkheads to the forward center section.

-Drilled and countersunk the nutplates on the forward center section.

-Deburred everything.

-Scuffed and cleaned in preparation for priming.

-Primed.
' style=

Assembling the forward center section for match drilliing

Assembling the forward center section for match drilliing

' style=

Machine countersinking the 4 nutplate rivet holes on the forward center section.

Machine countersinking the 4 nutplate rivet holes on the forward center section.

' style=

Primed and ready to rivet.

Primed and ready to rivet.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.