Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
All
4-21-2008
< Previous Log Entry
Next Log Entry >
Date:
4-21-2008
Number of Hours:
1.10
Manual Reference:
8-6
Brief Description:
Gear Tower - Assembly #11
I am in school this week (aircraft recurrent) so my progress will be a little spotty for the next 5 days.
Today I did:
-Cleco'd the aft and forward upper braces (F-802T-1 and F-802N-1) to the gear towers and match drilled.
-Cleco'd the throttle quadrant bracket (F-864D-1) and match-drilled.
-Drilled out the #40 nutplate rivet attach holes as specificed in the plans for the parts listed above.
-Machine countersunk the nutplate attach holes (all but one per the plans) in the F-878-L-1 & R-1 mid cabin braces.
-Dimple countersunk the nutplate rivet attach holes in the throttle quadrant bracket.
-Deburred all of the holes I drilled in the above steps. Edge deburred the same.
-Scuffed all of the parts for priming.
Match drilling the aft upper brace to the right gear tower.
Drilling out the #40 nutplate attach holes in one of the mid cabin braces.
All of the parts discussed above ready for primer.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.