Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
All
4-13-2008
< Previous Log Entry
Next Log Entry >
Date:
4-13-2008
Number of Hours:
1.20
Manual Reference:
8-5
Brief Description:
Gear Tower - Assembly #2
Feeling really motivated to work on the plane since I returned from vacation.
-Cleco'd the forward and aft angles onto the forward and aft bulkheads for each gear tower (including nutplates).
-Riveted the angles and nutplates to their respective bulkheads (fore/aft) on both left and right towers.
-
Riveting the primered angles onto the bulkhead (2 per tower - 4 total).
The corner angle riveted on - the other holes are for 3/16" bolts.
This step done.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.