Brief Description: Started laying out the wing walk doubler
Up at 5am this morning before work. I worked on the wing walk doublers. The plans have you cutting the doublers out of two larger pieces and then laying it under the W-702 skin and match drilling. Took me some time just to locate all the pieces and figure out how I wanted to attack the task. Once I got to drilling it went very fast. I drilled out the right wing and I have to do the left one this afternoon.
Laying out the doubler material and skins that will be used as a template for drilling the holes.