-Fixed the wire that was pulled out of the flap relay circuit board. -Secured and rigged the elevator trim -Put 40, 30, 20, and 10 degree marks on the left flap. They appear as the flap travel downward. -Put 'no step' placards on flaps -Put the fuel filler placards on -Worked on timing the mags. Got them installed, but the left one may be a tooth off. Lots of learning curve here...