Today was just lots of wierd misc stuff. -Put the remaining gear bolt in the base of the gear tower.
-Installed the 12v socket and the alum wemac air vent into the aft seat stick boot/center console.
-Trimmed the aft baggage liner to allow for the rear headset jack wires to go through.
-Put the cowling halves together so I can fix a gap I have on the left side air inlet.
-Fab'd a 9/32 spacer for the canopy latch shaft to take out the free play.
-Organized some of my brown bag hardware into bins. I know most people do this at the beginning, but I like how Van arranges hardware by component, but now that I'm done with most of the components the bags aren't much help.
12v socket and air vent for the aft cockpit
Fab'd this space for the canopy latch
The right air inlet needs some trimming and filler work