Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
All
12-8-2010
< Previous Log Entry
Next Log Entry >
Date:
12-8-2010
Number of Hours:
1.00
Manual Reference:
Brief Description:
Fwd Baggage Door #16
-Fininished riveting the inner skin to the door - pain.
-Opened up the tooling holes where the engagement pins run for -4 snap bushings. Opened the snap bushings (2) to 5/16" ID. Installed on the door.
-My lock appears too long so I'll take it back and get a shorter one - hopefully.
Riveting the inner skin - cold - 15F outside and probaly 35 in the garage when this was taken
Inner skin riveted on. You can see one of the engagement pins and bushing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.