KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  3-25-2010
Number of Hours:  1.10
Manual Reference:  
Brief Description:  Panel wiring +

This morning I installed the g-meter and hobbs into the right subpanel and wired the switches for the left subpanel. The wires were already there I just needed to trim to length and crimp on connectors and plug them into the appropriate switch. Also had to open up the grommet hole for the static line that goes through the left subpanel.
' style=

Left subpanel switches (nav, taxi lgt, ldg lgt, strobe & boost pump)

Left subpanel switches (nav, taxi lgt, ldg lgt, strobe & boost pump)

' style=

Hobbs and g-meter

Hobbs and g-meter

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.