KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  3-22-2010
Number of Hours:  1.30
Manual Reference:  
Brief Description:  c/b panel finished and started on sub panels

Got the c/b panel done. I got all the switches (except mags) wired and all the wires tucked away. I still need to secure the various bundles a little better, but I was more or less testing how the encloser fit with everything in place. I will probably line the fuselage side wall with material to prevent any chaffs and the same for the bus bars (incase a wire gets in the wrong place and droops down onto the c/bs). There is a bit of a delicate balance between having enough of a service loop to get the panel open and not having wires too loose that they get against something bad. If I had to do it again I would put the intercom in the panel and I would have spaced the c/b further apart vertically and horizontally.

I then put the switches and the air vent into the left subpanel.
' style=

Everything in place under the c/b switch panel.

Everything in place under the c/b switch panel.

' style=

Here it is closed up.

Here it is closed up.

' style=

Sub panels in place along with the left hand switches (lights and bp) and the vent.

Sub panels in place along with the left hand switches (lights and bp) and the vent.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.