KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's 650B
' style=
Date:  8-26-2023
Number of Hours:  2.50
Manual Reference:  6-w-10
Brief Description:  Preparing to rivet LH top skin & L.E.

Got the L/H leading edge skin strapped down tight and clecos installed to realign the skins.
re-checked the level on the wing before beginning to install the rivets.
' style=

L.E strapped down

L.E strapped down

' style=

L.E strapped down

L.E strapped down

' style=

Recheck level before riveting

Recheck level before riveting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.