Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
8-26-2023
< Previous Log Entry
Next Log Entry >
Date:
8-26-2023
Number of Hours:
1.50
Manual Reference:
6-w-6
Brief Description:
re-installing fuel tank in LH wing
applied cork strips to tank and re-installed into LE cavity.
Tape is on inside of LE skin to catch shavings from drilling rivet holes for nutplates for cover panel
LH Tank back in cavity
LH Tank back in cavity
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.