Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Final Assembly
11-8-2011
< Previous Log Entry
Next Log Entry >
Date:
11-8-2011
Number of Hours:
8.00
Manual Reference:
Brief Description:
Wing-to-fuselage wiring
Completed wing-to-fuselage wiring as follows:
1. Located and drilled holes in forward fuselage in line with the forward lightening holes in the wing leading edge ribs.
2. Inserted grommets and passed wiring through the holes.
3. Installed matching molex connectors on the fuselage wiring to the landing lights, navigation lights, and strobe lights from both wings.
4. Installed 9-pin DSUB connector on fuselage end of the Dynon remote compass / OAT cable.
5. Performed function tests. - all OK.
6. Upgraded Dynon firmware to version 5.4.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.