Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Engine
8-20-2011
< Previous Log Entry
Next Log Entry >
Date:
8-20-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Final fitting / trimming of cowling
Completed final fitting and trimming of cowling as follows:
1. Worked on rear edges of cowl to attain better fit against the firewall joggle.
2. Drilled top cowling holes to #40 and cleco'd in place.
3. Removed cowling. Final cut, trim and sanded air intakes.
4. Marked and cut out oil door opening.
5. Drilled top cowl for oil door frame.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.