Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Engine
8-14-2011
< Previous Log Entry
Next Log Entry >
Date:
8-14-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Fitting of top cowl
Fitted top cowl per Rans video and manual as follows:
1. Rough cut the prop flange and cylinder openings on top cowl.
2. Performed initial seam cut behind spnner back plate and just aft of cylinder opening.
3. Drilled fastener holes for inboard fasteners on cylinder openings to #40, then to #30.
4. Made rough cut on aft edge of top cowl to expose firewall rivets.
5. Measured final cut from 3" reference line and made final cut. Filed and sanded edge smooth.
6. Made rough cut on bottom edge of top cowl for seam with bottom cowl.
7. Measured final cut from 1" reference line and made final cut. Filed and sanded edge smooth.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.