Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Fuselage
6-19-2011
< Previous Log Entry
Next Log Entry >
Date:
6-19-2011
Number of Hours:
3.00
Manual Reference:
Brief Description:
Fuselage wiring 2
Continued fuselage wiring as follows:
1. Connected pitch servo to previously-prepared harness.
2. Installed BNC connectors on transponder and aft VHF antenna cables. Connected transponder antenna.
3. Brought wiring and static tubing foward from the tailcone into the center section and tied into placed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.