Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Fuselage
6-26-2011
< Previous Log Entry
Next Log Entry >
Date:
6-26-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Fuselage final assembly - main landing gear
Continued fuselage final assembly as follows:
1. Checked fit of main landing gear legs and associated parts. Primed small parts and attachment tips of main landing gear legs.
2. Installed axles, wheel faring brackets and brake assemblies to gear legs. Modified axles to accept wheel fairings.
3. Installed main landing gear legs to fuselage using provided hardware. Torqued nuts and applied torque seal.
4. Assembled wheels, tires / tubes, and brake disks. Lubricated wheel bearings with Lubriplate synthetic wheel bearing grease.
5. Raised gear legs and installed wheels. Torquing of bearing nuts and installation of cotter pins will be deferred.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.