KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  6-10-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fuselage final assembly - fairleads, fuel selector

Received parts from powder coating and continued fuselage final assembly as follows:

1. Removed rudder cable fairleads from center spar and installed per guidance received from Rans tech support.

2. Riveted forward longerons to center fusleage and upper firewall weldment.

3. Installed fuel selector valve and panel. Connected to fuel line previously installed.

4. Set length of forward stabilator push-pull tube to 45.6" and installed. Bolted forward bearing to stick assembly torque tube and installed cotter pin.

5. Re-installed battery box and oil cooler mount to firewall.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.