KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  6-5-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Fuselage final assembly - rudder cables, sticks, e

Continued fuselage final assembly as follows:

1. Riveted floor channels to center spar.

2. Prepped, primed, and riveted forward rudder pulley assembly. Passed rudder cables through and attached pullies using provided hardware.

3. Attached rudder cable fair leads to fuselage center section.

4. Riveted fuel selector support and angle to forward floor.

5. Attached control stick assembly using AN4 hardware provided. Left nuts loose for now.

6. Attached VHF comm antenna to center section. Sealed with Dow Corning 738 sealant.

7. Attached nose gear mount and engine mount using AN5 hardware. Torqued nuts to spec.

8. Installed fuel line that runs from the fuel selector to the firewall. Tightened "B" nuts and attached hose to floor with 3 adel clamps. Plugged aft end of line pending fuel selector installation.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.