KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  5-1-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Misc. fuselage tasks 2

Completed various fuselage tasks as follows:

1. Filled antenna opening in top fuselage deck. Fabricated a panel of plastic to fill the antenna opening in the top deck. Drilled holes and cleco'd in place.

2. Located fuel fittings in fuselage sides. Installed AN807-6D firewall fittings in the side skins. These fittings provide the transition from the wing root into the fuselage. A short piece of rubber hose will join the wing and fuselage. Aluminum tubing will be used in the fuselage.

3. Fabricated RH fuel line. Fabricated a fuel line from 3/8" 5052-0 aluminum tubing and aluminmum flare fittings. Clamped the line to the fuselage floor using adel clamps.

4. Fabricated fuel valve to firewall line. Fabricated fuel line from fuel selector valve to the fitting mounted to the firewall. Adel clamps will be added later.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.