Brief Description: Drilling of center fuselage skins
Completed drilling of center fuselage skins as follows:
1. Enlarged all #40 holes to #30 as much as possible for this stage of construction. Left holes where mating to other sections at original sizes for now.
2. Reamed bolt holes in gear blocks to fit 3/16 close tolerance bolts.
3. Drilled antenna mounting to fit a UAT antenna. The antenna will be installed and wired for a future ADS-B installation.
4. Dismantled center section and placed in storage until priming weather arrives.