Tom's Rans S-19 Builders Log
' style=
Date:  1-23-2011
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Forward fuselage wiring 3

Continued forward fuselage wiring as follows:

1. Completed fuselage and panel wiring as much as possible for this stage of construction. Many loose wires through the firewall and destined for the center and rear fuselage sections that are partially wired and routed..

2. Connected the panel to the forward fuselage and temporarily installed for testing. Connected a 13.5 volt power supply and sequentially applied power.

3. All functions that could be tested passed successfully. Removed panel and set aside until fuselage construction is further along.