1. Installed control cables for choke, carb heat, throttle, parking brake and cabin heat. Installed cabin heat valve. Connected cables for parking brake and cabin heat. Other cables passed through firewall fittings.
2. Continued system wiring, installing cable attach points, routing and tieing cables.