Date:
1-8-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Forward fuselage wiring 1
Began forward fusleage wiring as follows:
1. Installed throttle brace and avionics support brackets.
2. Installed previously wired sub panel.
3. Installed panel dimmer module to upper forward fuselage frame.
4. Installed headset jacks.
5. Installed small fuse block.
6. Pre-wired fuel flow transmitter to top of firewall.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.