Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Wings
9-25-2010
< Previous Log Entry
Next Log Entry >
Date:
9-25-2010
Number of Hours:
3.00
Manual Reference:
Brief Description:
RH wing - fitting of torque angle & landing light
Completed fitting of the tank bay torque angle and landing light lens as follows:
1. Formed shape of torque angle to match profile of wing underside using a vise and plastic mallet.
2. Drilled rivet holes to match wing skins using strap duplicators.
3. Removed forward tip skin from wing assembly and cut out landing light opening with shears. Replaced forward tip skin and cleco'd in place.
4. Rough cut some 1/16" lexan sheet and used heat gun and some metal tubing to form leading edge bend.
5. Inserted landing light lens in place and drilled rivet holes. Removed lens and trimmed excess.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.