Powered By Kitlog Pro v2.0
Cheetah XLS Web Site
Cheetah XLS
Fuselage
11-1-2007
< Previous Log Entry
Next Log Entry >
Date:
11-1-2007
Number of Hours:
0.25
Manual Reference:
Page 013
Brief Description:
Fuselage assembly, top
Note: Items 4 & 5 on page 13 brackets must be place on the correct side. There is a left and right. The long side of item 4 & 5 must be positioned so it is on the front side.
Shows both bottom (inside) and top (outside)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cheetah XLS Home
Category
# Logs
# Hours
All
106
191
Avionics
3
33
Cockpit
15
38
Control linkages
14
14
Empennage
11
12
Engine
6
12
Fuselage
26
26
Landing Gear
9
7
Pre Assembly
5
12
Tools
1
Wings
16
37
Copyright © 2001-2024 Matronics. All Rights Reserved.