16 Logs Found 
First Photo
Date

Work Log Summary

12-02-2007
Tensioning the wing
After left wing is on and right is ready for struts
11-30-2007
Wings installation
Other side gets the same
11-30-2007
Wing struts installation
11-30-2007
Wing struts assembly
After installation of ailerons and flaps but before control linkages are hooked up.
11-30-2007
Aileron + Flap installation
Barndoor flaps
11-26-2007
Flap assembly

11-26-2007
Aileron assembly
wing with the battens installed
11-11-2007
Wing battens installation
11-09-2007
wing stretch mechanism assembly
After installing the sail (wing tip view)
11-08-2007
Wing sail installation
Leading and trailing edge spar ready for building wing
11-04-2007
Wing frame assembly
Trailing edge hardware and spar
11-04-2007
Trailing edge tube assembly
11-04-2007
Sail stretching tube assembly
Leading edge spar.
11-04-2007
Leading edge tube assembly
11-04-2007
Flap bellcrank installation
Pushrods
11-04-2007
Flap and aileron pushrots