11 Logs Found 
First Photo
Date

Work Log Summary


11-30-2007
Horizontal stabilizer adjustment cables installed
Elevator trim
11-27-2007
Elevator trim installation

11-25-2007
Rudder installation
11-23-2007
Horizontal stabilizer assembly
11-23-2007
Elevator installation
11-22-2007
Horizontal stabilizer installation

11-22-2007
Elevator assembly
Came fully assembled
11-18-2007
Rudder assembly
After installing the vertical stabilizer(Should have ventral fin at this point!)
11-09-2007
Fuselage + vertical stabilizer assembly (Plus vent
Top tension cables after being installed
11-08-2007
Vertical stabilizer sail installation
This is the vertical stab after being bolted. It came complete
11-04-2007
Vertical stabilizer frame assembly