Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-9A
All
12-12-2021
< Previous Log Entry
Next Log Entry >
Date:
12-12-2021
Number of Hours:
3.50
Manual Reference:
Brief Description:
Fuselage (aft deck)
After leveling the fuselage. (Both fore and aft, and side to side), I fit the 714 aft deck and drilled the mounting holes. Fabricated the 710-c and 711-e spacers.
After priming and prep, riveted it into place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
286
1243
Avionics
1
4
Empennage
71
282
Engine
1
1
Fuel Tank Assembly
18
96
Fuselage
77
363
Service Bulletins
2
2
Tech Support
1
1
Tools
7
32
Wings
108
462
Copyright © 2001-2024 Matronics. All Rights Reserved.