Finished dimpling on the R.wing upper skins. Began work on the "skeleton". First, Be-Burred all holes. Next, did the Counter sinking on the rivet holes in the main spar, and dimpling the ribs and rear spar. Completed both sides, (Upper and Lower) Had to remove the skeleton from the wing stand to be able to get all the holes prepped for assembly.