Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-9A
All
5-15-2020
< Previous Log Entry
Next Log Entry >
Date:
5-15-2020
Number of Hours:
2.00
Manual Reference:
Brief Description:
R. fuel tank (Drain and fuel cap)
Mixed another small batch of proseal and installed the Fuel drain flange and Fuel cap mount.
Ready to put into the cradle and begin installing the ribs.
Fuel can mount flange
fuel drain flange.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
286
1243
Avionics
1
4
Empennage
71
282
Engine
1
1
Fuel Tank Assembly
18
96
Fuselage
77
363
Service Bulletins
2
2
Tech Support
1
1
Tools
7
32
Wings
108
462
Copyright © 2001-2024 Matronics. All Rights Reserved.